Tuesday, 2 February 2016

Task 10: Production and Filming schedule

Production Schedule

A production schedule is a timeline of how we will film and edit things. It is important to meet deadlines so that we don't fall behind and have enough time to film and edit things to the best of our abilities. 


 


When? (Main filming days)
21st and 22nd October 2015
1st November 2015
Who?
Katie (Director)
Oliver (Camera operator)
Kirsty (Producer)
Lydia (Actor)
Where?
21st Oct:
House 1
Street 1
Field
Wall
Bedroom

22nd Oct:
House 2
Street 2

1st Nov:
School (White wall)


What? (Scenes)
21st Oct:
1-8
11-15
23-26
27-32
34-37
50

22nd Oct:
17-19
44-47

1st Nov:
9-10
16
20-22
38-43
48-49
33
What? (Type of shots)
-Establishing shots
-Tracking shots
-P.O.V
-Long shots
-Medium shots
-High angles
-Low angles
-Pans
-Close ups
-Extreme close ups
-Tilts
What? (Equipment)
-HD camera
-Tripod
-Dolly
-Steady Frame
Props
-Skeleton toy
-Halloween decorations
-Cardboard boxes
-Plaster
-Old photos of girl and boyfriend
-Photos of girl and skeleton
-Box of tissues
-Ladder (for the attic)
-Extra clothes to throw
-Birthday cake
-Birthday candles
-Piano
-(School) bag
-Trick or treat bags
-Car
-Wardrobe
-Party hats
-Party streamers
-Pen and paper
-Bed
-Hammer
Costumes
-Normal everyday clothes (e.g-top and jeans)
-Halloween Costumes (skeleton and witch hat)
-PJs
-Fancy top (for birthday scene)
-Outdoor clothes (hoodie)
-Hair should be both tied up and down (depending on the scene)
-Bold lipstick (e.g bright pink)










No comments:

Post a Comment